METROBANK

BRISTOL

Client: Basebuild Services
Project: MetroBank Bristol
Value: £500k
Duration: 6 months

Scope of work

  • To break out and make alterations to existing shell for high end design and finishes to new MetroBank in Birmingham.
  • Foul and Storm Drainage
  • Concrete Slab
  • Hollow Rib Metal Deck slabs
  • Lift Shafts